Showing posts with label flooring. Show all posts
Showing posts with label flooring. Show all posts

Thursday, September 21, 2006

One week left

Well I've been really busy lately trying to get things wrapped up before the big move day. Since I last posted I've gotten a lot done. The doors and drawers are lacquered for the bedroom closets. Dave has installed all of the lights, switches, plugs etc. I've grouted the bathroom. Installed the tile in the entry and around the fireplace, and grouted it. Installed the cork in the bedrooms and the living room. The kitchen sink, stove, and dishwasher are all installed and working properly. The kitchen countertops are installed. All of the walnut doors are installed, they were a little challenging but the Johnson Hardware track works great. I've got some more photos and will try and get some more posted. If you have any questions let me know. I'm off to install the shower fixtures and finish up the details.


Posted by Picasa

Tuesday, August 29, 2006

Sunday


Sundays are for grouting. I had a big crew for grouting. I floated the grout in everywhere, Jessica and my Mom sponged and cleaned behind me. My friend Chris did the final pass and emptied and refilled all of the buckets of water. My dad had relief duty. We got the whole floor done in about 3 hours and I was satisfied. It wasn't to bad, but crawling on your hands and knees for three hours on tile gets old really quick. I didn't get any pictures because we were all working to hard. That's Chris and I installing the toilet in the guest bath. After a few errors we got it installed, the next one will be much easier. Dave the electrician also worked this weekend and got the majority of the switches and plugs wired up. Hopefully the rest of my tile will come in before this weekend and the bathroom will be tackled.
Posted by Picasa

Saturday

Last weekend was a good one. I had a lot of help. We laid all of the tile in the lower level on Saturday. Tony laid the majority of the tile. Doug ran the saw, my dad cut the straight cuts on the tile cutter, and I fed Tony the tile. It was a combined effort, we laid close to 400 sq.ft of tile around my maze of a kitchen. I really like the way it turned out.


Posted by Picasa

Floor Leveler Sucks

Here's the progress that we made last week during the week. Things are really starting to come together. The first shot is showing the primer on the kitchen ceiling. The next few shots show the ceiling painted and a decent shot of how the cabinets turned out. The blue stuff on the floor is an adhesive that holds the floor leveler to the old concrete. I didn't get any good shots of the floor leveler. It didn't work as well as I thought it wood. It definitely helped a few of my low spots. Trying to pour it was like trying to spread hot fudge. I recommend mixing it a lot thinner then the directions tell you to.


Posted by Picasa

Friday, August 18, 2006

$1.50 per pound

I recieved my cork flooring yesterday. I ended up ordering it from www.blackriverfloors.com on tuesday I wasn't expecting the three day delivery but I'm not complaining. I think the cork should go down pretty quickly, but then I'm going to put two coats of sealer on top. I can't decide if I need to get the floor pad to cut down on noise or not. The lacquer is going on, and it looks really good. I'll post some pics of the finished product after I get the paper off of the windows to get some more light inside. I'm having trouble finding the appropiate lighting. I thought I had them all picked, but I'm second guessing myself.


Posted by Picasa